A 3-room resale renovation package costs about S$29,888 to S$31,888 with us in 2026. That covers demolition, new tiling, plumbing, a kitchen with cabinets and countertop, painting and cleaning for the whole flat. If only the wet areas need work, a kitchen and two bathrooms package costs about S$25,000 to S$27,500.

Wardrobes, rewiring, windows and aircon are separate from the items listed in our package, so plan for them from the start. This guide covers what is included, what to add and which HDB rules apply to an older flat.

3-room resale renovation package prices at a glance

PackagePriceWhat it covers
3-room resale, whole flatS$29,888 – S$31,888Demolition, tiling, plumbing, kitchen, painting and cleaning
Kitchen + two bathrooms onlyS$25,000 – S$27,500Demolition, waterproofing, tiling and plumbing for the three rooms, plus kitchen cabinets
3-room BTO, for comparisonS$18,000 – S$20,000Flooring, kitchen, plumbing, painting and cleaning

Loose furniture and appliances are not included. For 4-room, 5-room and executive flats, see our HDB renovation cost guide.

What our 3-room resale package includes

Living room of a 3-room HDB flat at Ang Mo Kio Avenue 8 by Earth Interior Design

WorkWhat is covered
DemolitionLiving room floor tiles, bedroom skirting, kitchen and bathroom wall and floor tiles, old doors and frames, WCs, sinks and kitchen cabinets
Tiling600 × 600 mm homogeneous tiles in the living room and passage, vinyl overlay in the bedrooms, new wall and floor tiles in the kitchen and bathrooms
Tile allowanceUp to S$3.50 per sq ft
PlumbingNew stainless steel water piping, 2 toilet bowls, 2 basins with taps, 2 instant heaters, accessories and kitchen sink connections
Kitchen20 ft of laminate cabinets with soft-close hinges and drawers, a 10 ft quartz countertop and hob and hood installation
PaintingWhole flat, 4 colours plus white
CleaningFloor protection, debris disposal and a general wash

The package is priced for two bathrooms. Some older 3-room flats have a single bathroom or a separate shower and WC, so ask for the quote to be adjusted to your layout.

What to budget for on top

ExtraTypical cost or next step
Built-in wardrobeS$380 – S$420 per foot run
TV consoleAbout S$1,080 – S$1,200 for 6 ft
Extra kitchen cabinets, laminateS$180 – S$200 per foot run
Tall kitchen unit, laminateS$450 – S$500 per foot run
Rewiring, extra power and lighting pointsQuoted after a site visit, based on the number of points
New windows and airconQuoted separately
Doors, false ceiling and feature wallsQuoted to your design

A pair of 5 ft wardrobes, for example, adds about S$3,800 to S$4,200. More item prices are in our carpentry cost guide and kitchen cost guide.

Why a resale flat costs more than a BTO

With a BTO you start with new tiles, new pipes and new bathrooms. In an older resale flat, those usually have to be removed before anything new goes in. For a 3-room flat, our resale package comes to about S$12,000 more than the BTO package.

The condition of the flat decides where in the range you land, and how much you add:

  • Floors. A level, sound floor can often take vinyl or another overlay. Hollow or cracked tiles have to go.
  • Bathrooms. An older bathroom often needs full hacking and new waterproofing. Our HDB toilet renovation package guide compares overlay and hacking.
  • Kitchen. Old cabinets and concrete sink supports need dismantling. See the HDB kitchen renovation package guide.
  • Electrical. Check the main switch before you plan aircon and kitchen appliances.

HDB rules for renovating an older 3-room flat

These come from HDB's renovation guidelines for building works, windows and electrical works (checked 25 November 2026).

WorkPermit?What to know
Removing an internal hollow block, brick or drywall partitionYesWork can only start after HDB's approval, and reinforced concrete structures must be left intact
Removing a non-load bearing reinforced concrete elementYesA Professional Engineer must supervise the demolition
Replacing floor tilesYesNew finishes and screed together must not exceed 50mm
Replacing bathroom floor tilesYesPre-packed waterproofing screed and a membrane turned up at least 150mm are needed
Overlaying floor finishes with adhesiveNoOnly over a single existing layer, up to 13mm including adhesive
Laying vinylNoA fast way to refresh bedrooms
Overlaying wall tiles with adhesiveNoUp to 13mm, and a third layer is not allowed
Replacing windowsYesA BCA Approved Window Contractor listed with HDB applies for the permit

Check the electrical supply too. HDB says blocks completed on or after 1 January 1994, or upgraded under the Main Upgrading Programme or Home Improvement Programme, have a 40-amp main switch. Older blocks that missed these upgrades may have less. Here is how to check your block's electrical supply and what to know about window replacement.

Design ideas for a 3-room resale flat

Kitchen with a long island in a 3-room HDB flat at Ang Mo Kio Avenue 8

The photos here are from our Ang Mo Kio Avenue 8 project, a 3-room HDB flat completed in 3 months. A few ideas that suit a compact flat:

  1. Use one floor tone throughout. Fewer breaks between rooms make the flat read as one larger space.
  2. Open the kitchen where the wall allows it. Find out whether the wall is structural before you settle on a layout.
  3. Let the counter do several jobs. A long counter can hold the sink, prep space and a washing machine.
  4. Build storage upwards. Full-height wardrobes and cabinets use the wall and keep the floor clear.
  5. Keep to two or three finishes. Pale walls with one darker cabinet colour stay calm in a small room.

How long does it take?

Most resale HDB renovations take 10 to 16 weeks. Smaller flats with less hacking finish sooner, while rewiring, wall removal and custom carpentry add time. Our guide to renovation timelines in Singapore explains each stage.

Checklist for comparing package quotes

  1. Hacking list. Which floors and walls are removed, and whether disposal is included.
  2. Number of bathrooms. The price should match your layout.
  3. Tile allowance. The price per square foot and where it applies.
  4. Waterproofing. Which areas are treated and how they are tested.
  5. Piping. Whether the water pipes are replaced and in what material.
  6. Kitchen length. The foot run of cabinets and countertop, and the rate for extra.
  7. Electrical. Whether any points or rewiring are included.
  8. Permits. Who applies, and whether the contractor is HDB-licensed.
  9. Warranty. How long workmanship and carpentry are covered.

Ways to keep the cost down

  • Keep windows and doors that are in good condition and repaint them.
  • Lay vinyl over sound bedroom floors.
  • Redo one bathroom fully and overlay the other if the tiles allow it.
  • Leave the kitchen sink and hob where they are.
  • Add non-essential carpentry after you move in.

Get a quote for your 3-room resale flat

Every older flat is different, so a site visit gives you a firmer number than a package list. See our HDB renovation work, or request a free quote with your flat type and floor plan.

Planning a renovation?
Get a free quote.

Get a Free Quote

We've completed 3,500+ projects, let's design yours next!

Select type
New or resale
Select rooms
Select budget

Where should we send your quote?

🇸🇬 +65