Collecting the keys to a new BTO is the start of a renovation that most couples only do once. A BTO is easier to renovate than a resale flat: the structure is new and there is little to hack, so most of the work and budget goes into design, carpentry and lighting.

This guide walks through the whole process, from inspecting defects to moving in, with the HDB rules to know, typical costs and timelines, and design ideas for each room.

Typical 4-room budget

S$48k – S$58k

Renovation works

8 – 12 weeks

Contractor

HDB-licensed required

Start

After key collection

Step by step: how a BTO renovation works

1. Collect your keys and inspect for defects

Check walls, floors, windows, doors and fittings, and report defects to HDB before any carpentry covers them. The defects liability period lasts one year from key collection.

2. Set your budget and brief

Decide how you live, what storage you need and roughly what you can spend. Our BTO cost guide gives typical ranges by flat size.

3. Choose your interior designer or contractor

Whoever carries out the works must be licensed by HDB. Compare portfolios, quotations and what is included.

4. Design and space planning

Your designer measures the flat, plans the layout and carpentry, and prepares 3D visuals. Allow 2 to 4 weeks to settle the design.

5. Permits

Your contractor applies for any HDB permits needed, for example to hack a non-structural wall.

6. Renovation works

Electrical and ceiling works come first, then flooring, carpentry installation, painting and fittings. Most BTO renovations take 8 to 12 weeks.

7. Handover and move in

Walk through the finished flat, list any touch-ups, and arrange cleaning before furniture and appliances arrive.

Rules to know

  • All renovation works in an HDB flat must be carried out by an HDB-licensed contractor.
  • Only non-structural walls can be removed, with an HDB permit.
  • Hacking of bathroom floor tiles is not allowed in the first three years after the flat is completed, to protect the waterproofing.
  • Aircon installation has its own requirements. See the aircon rules.
  • Under the Optional Component Scheme you choose whether HDB fits flooring, internal doors and sanitary fittings, which changes what your renovation needs to cover.

Rules can change. Check the latest with the relevant authority or management, or ask us and we will check them for your home before work starts.

Costs and timeline

BTO Renovation Cost Singapore

BudgetTypical range (SGD)
3-room BTOS$38k – S$46k
4-room BTOS$48k – S$58k
5-room BTOS$55k – S$66k
Typical timeline8 – 12 weeks
See the full cost breakdown
Want a quotation for your bto home?
Get a free quote

Design ideas

Room-by-room ideas, styles and budgets from our design guides:

Our BTO projects

Yio Chu Kang Road 4-room BTO renovation by Earth Interior Design4-room BTO

Yio Chu Kang Road

3-month renovation

Ghim Moh Link 4-room BTO renovation by Earth Interior Design4-room BTO

Ghim Moh Link

3-month renovation

Frequently asked questions

After you collect your keys. Inspect the flat and report defects to HDB first, so they are fixed before carpentry and fittings go in.

It is not required, but a designer plans the layout, carpentry and lighting together and coordinates the trades. Whoever does the works must be an HDB-licensed contractor.

Most 4-room BTO renovations cost S$48,000 to S$58,000 in 2026. See the BTO renovation cost guide for 3, 4 and 5-room ranges and a breakdown.

Usually 8 to 12 weeks of works, after 2 to 4 weeks of design. Our renovation timeline guide covers each stage.

Built-in storage and the kitchen, since they are hardest to change later, followed by lighting. Loose furniture and decor are easy to add over time.

Planning your bto renovation?

Get a free quote from us

Or... just talk to us!