4-Room BTO Renovation Package Singapore (2026): Price and What's Included

26 Nov 2026 · 6 min read

A 4-room BTO renovation package costs about S$19,500 to S$21,500 with us in 2026. This Standard package covers flooring, a kitchen with cabinets and countertop, plumbing installation, painting and cleaning. If your flat already has flooring you want to keep, our Premium package costs about S$13,900 to S$15,300 and swaps the flooring for a set of add-ons such as a wardrobe and shoe cabinet.

Add wardrobes for three bedrooms, a shoe cabinet and a TV console to the Standard package and a 4-room BTO comes to about S$27,800 to S$30,700. The sample budget below shows how.

4-room BTO package prices at a glance

PackagePriceBest for
4-room BTO StandardS$19,500 – S$21,500A flat that needs new flooring
BTO Premium (any size)S$13,900 – S$15,300A flat with flooring you are keeping
Standard plus wardrobes, shoe cabinet and TV consoleAbout S$27,800 – S$30,700A flat with built-in storage in every bedroom
4-room resale, for comparisonS$33,888 – S$35,888An older flat that needs demolition and new wet areas

Loose furniture and appliances are not included. For 3-room and 5-room prices, see our BTO renovation cost guide.

What the 4-room Standard package includes

Living room of a 4-room BTO flat at Ghim Moh Link with a green feature wall by Earth Interior Design

WorkWhat is covered
Living room and passage floor600 × 600 mm homogeneous tiles with skirting, tiles up to S$3.50 per sq ft
Bedroom floorsHigh-resilience vinyl with skirting
Floor preparationCement screeding and self-levelling
KerbsMain entrance, kitchen cabinets and both bathroom showers
Kitchen cabinets20 ft in laminate, soft-close hinges and drawers, dish rack, cutlery tray and a frosted glass lift-up door
Countertop10 ft of quartz with a 50 mm backsplash
Kitchen installationHob, hood and sink
Plumbing2 instant heaters or 1 storage heater, and 2 bathroom accessory sets; accessories supplied by you
PaintingWhole flat in Nippon Paint Vinilex 5000, 4 colours plus white
Clean-upFloor protection, debris disposal and a general wash

Standard or Premium: which one fits your flat?

Your floors decide it. If you received the flat without flooring, or plan to change it, start with Standard. If you took HDB's flooring and are happy with it, Premium puts that money into carpentry or windows.

Premium includes the same kitchen, plumbing, painting and clean-up, a kitchen mortar base with tiled skirting, and one of these sets:

Premium setWhat you get
Set 1Service yard sliding window with grilles, a 3 ft full-height shoe cabinet and a 5 ft sliding wardrobe
Set 2A 5 ft suspended TV console, a 5 ft half-height feature wall and a 5 ft casement wardrobe
Set 3Window grilles for the whole flat, service yard sliding windows and a 3 ft shoe cabinet

Sample budget: Standard package plus storage

These lengths are an example. Measure your own walls and adjust them.

ItemRateEstimate
4-room BTO Standard packagePackage priceS$19,500 – S$21,500
Master bedroom casement wardrobe, 6 ftS$380 – S$420 per foot runS$2,280 – S$2,520
Two bedroom casement wardrobes, 5 ft eachS$380 – S$420 per foot runS$3,800 – S$4,200
Full-height shoe cabinet, 3 ftS$380 – S$420 per foot runS$1,140 – S$1,260
TV console, 6 ftS$180 – S$200 per foot runS$1,080 – S$1,200
TotalS$27,800 – S$30,680

All rates are for laminate, from our carpentry cost guide. Electrical points, aircon, false ceilings, doors, shower screens and lights are quoted separately to your plan. A flat gypsum ceiling costs about S$5 to S$6 per sq ft, and extra kitchen cabinets S$180 to S$200 per foot run.

Why some 4-room quotes are much higher

A package covers a fixed list of works. A fully designed home adds carpentry in most rooms, false ceilings, lighting, feature walls and upgraded finishes. Full renovations of 4-room HDB flats, BTO and resale together, typically cost S$35,000 to S$100,000 in our completed projects.

When two quotes are far apart, compare the foot run of carpentry first, then the electrical points and ceilings. Those explain most of the gap.

Design ideas from a real 4-room BTO

Kitchen with pale cabinets along both walls in a 4-room BTO flat at Ghim Moh Link

The photos here are from our Ghim Moh Link project, a 4-room BTO completed in 3 months. It was designed for its owners, so its scope differs from the package.

  1. Give one wall a strong colour. Deep green paint behind the TV anchors the living room.
  2. Use cabinets on both sides of the kitchen. The walkway stays clear and the counters work as a pair.
  3. Choose pale, plain doors for tall storage. Full-height white cabinets blend into the wall.
  4. Mark the dining area overhead. A timber-look ceiling band separates the two zones without a wall.

More layouts are in our BTO kitchen ideas and BTO living room ideas.

HDB rules that affect a new 4-room flat

These come from HDB's renovation guidelines for building works (checked 26 November 2026).

WorkPermit?What to know
Laying vinylNoSuits bedrooms and quick floor changes
Laying new finishes over existing floor finishes with adhesiveNoOne existing layer only, up to 13mm including adhesive
Replacing existing floor tilesYesFinishes and screed together must not exceed 50mm
Removing bathroom wall or floor finishesRestrictedNewly built flats have a 3-year restriction period
Removing a hollow block, brick or drywall partitionYesWork starts only after HDB's approval
Installing a false ceiling in the flatNoAt least 2.4m clear height, using non-combustible materials; bathrooms are exempt from the height rule

Check that your contractor is HDB-licensed before you sign. Inspect the flat for defects and report them before any carpentry goes up.

How long does it take?

Most BTO renovations take 8 to 12 weeks of works. Carpentry is the longest stage, at 2 to 4 weeks in the factory. Our BTO renovation timeline goes through it week by week.

Checklist for comparing 4-room BTO packages

  1. Floor area. Which rooms get tiles, which get vinyl, and the tile allowance.
  2. Screeding. Whether floor preparation is in the price.
  3. Cabinet length. The foot run of kitchen cabinets and countertop, and the rate for extra.
  4. Wardrobes. How many, how long and whether drawers are included.
  5. Electrical. How many power and lighting points you get, if any.
  6. Supply or install. Who buys the sink, taps, heaters and accessories.
  7. Board grade. The plywood and its formaldehyde rating. We use ENF-grade plywood.
  8. Clean-up. Haulage, floor protection and the final wash.

Frequently asked questions

How much is a 4-room BTO renovation package in Singapore?

Our 4-room BTO Standard package costs about S$19,500 to S$21,500 in 2026. The BTO Premium package, for flats that need no flooring, costs about S$13,900 to S$15,300.

Does the package include wardrobes?

The Standard package does not. Premium Sets 1 and 2 each include one 5 ft wardrobe. Extra casement wardrobes cost S$380 to S$420 per foot run.

Does the package include bathroom tiling?

No. New bathrooms are kept as they are, and HDB restricts removing bathroom finishes in newly built flats for 3 years. The package adds shower kerbs and installs heaters and accessories.

Is a 4-room BTO cheaper to renovate than a 4-room resale flat?

Yes. Our 4-room resale package costs about S$14,400 more, because it includes demolition, new tiling and new bathrooms. See the HDB cost guide.

Get a quote for your 4-room BTO

Send us your floor plan and we can work out the flooring, cabinet lengths and add-ons for your layout. See our HDB renovation work, or request a free quote.

Planning a renovation?
Get a free quote.

Get a Free Quote

We've completed 3,500+ projects, let's design yours next!

Select type
New or resale
Select rooms
Select budget

Where should we send your quote?

🇸🇬 +65