A 4-room resale renovation package costs about S$33,888 to S$35,888 with us in 2026. That covers demolition, new tiling, new plumbing, a kitchen with cabinets and a quartz countertop, painting and cleaning for the whole flat. If only the kitchen and two bathrooms need work, that package costs about S$25,000 to S$27,500.
Add wardrobes for three bedrooms, a shoe cabinet and a TV console, and a 4-room resale flat comes to about S$42,200 to S$45,100. The sample budget below shows how, and the rest of this guide covers the extras and HDB rules that apply to an older flat.
4-room resale package prices at a glance
| Package | Price | Best for |
|---|---|---|
| 4-room resale, whole flat | S$33,888 – S$35,888 | An older flat that needs new floors, wet areas and a kitchen |
| Kitchen + two bathrooms only | S$25,000 – S$27,500 | A flat with sound floors where only the wet areas are worn |
| 4-room BTO, for comparison | S$19,500 – S$21,500 | A new flat with no demolition |
Loose furniture and appliances are not included. For 3-room, 5-room and executive flats, see our HDB renovation cost guide and the 3-room resale package guide.
What our 4-room resale package includes

| Work | What is covered |
|---|---|
| Demolition | Living room and main balcony floor tiles, bedroom skirting, kitchen and bathroom wall and floor tiles, old doors and frames, WCs, sinks, accessories and kitchen cabinets |
| Tiling | 600 × 600 mm homogeneous tiles with skirting in the living room and passage, vinyl overlay in the bedrooms, new wall and floor tiles in the kitchen and both bathrooms |
| Tile allowance | Up to S$3.50 per sq ft |
| Other floor works | Kitchen and fridge bases and a main door kerb |
| Plumbing | New stainless steel water piping, 2 toilet bowls, 2 basins with taps, 2 instant heaters, 2 spray jets, 2 two-way taps, 2 sets of bathroom accessories, and kitchen sink and washing machine connections |
| Kitchen | 20 ft of laminate cabinets with soft-close hinges and drawers, a 10 ft quartz countertop with a 50 mm backsplash, and hob and hood installation |
| Painting | Whole flat in Nippon Paint Vinilex 5000, 4 colours plus white |
| Clean-up | Floor protection, debris disposal and a general wash |
Sample budget: package plus storage
These lengths are an example. Measure your own walls and adjust them.
| Item | Rate | Estimate |
|---|---|---|
| 4-room resale package | Package price | S$33,888 – S$35,888 |
| Master bedroom casement wardrobe, 6 ft | S$380 – S$420 per foot run | S$2,280 – S$2,520 |
| Two bedroom casement wardrobes, 5 ft each | S$380 – S$420 per foot run | S$3,800 – S$4,200 |
| Full-height shoe cabinet, 3 ft | S$380 – S$420 per foot run | S$1,140 – S$1,260 |
| TV console, 6 ft | S$180 – S$200 per foot run | S$1,080 – S$1,200 |
| Total | S$42,188 – S$45,068 |
All rates are for laminate, from our carpentry cost guide. Extra kitchen cabinets cost S$180 to S$200 per foot run and a tall kitchen unit S$450 to S$500 per foot run; more items are in the kitchen cost guide.
What to budget for on top
| Extra | Typical cost or next step |
|---|---|
| Rewiring, extra power and lighting points | Quoted after a site visit, based on the number of points |
| New windows | Quoted separately, installed by an approved window contractor |
| Aircon | Quoted separately; check the main switch first |
| Doors, false ceiling and feature walls | Quoted to your design |
| Shower screens and lights | Quoted to your choice of fittings |
Why a resale flat costs more than a BTO
In our packages, a 4-room resale flat costs about S$14,400 more than a 4-room BTO. A BTO arrives with new tiles, pipes and bathrooms. In an older flat, those usually have to come out first, and the debris has to be carted away.
The condition of the flat decides where in the range you land and how much you add:
- Floors. A level, sound floor can often take vinyl or another overlay. Hollow or cracked tiles have to go.
- Bathrooms. Older bathrooms often need full hacking and new waterproofing. Our HDB toilet renovation package guide compares overlay and hacking.
- Kitchen. Old cabinets and concrete sink supports need dismantling. See the HDB kitchen renovation package guide.
- Electrical. Older wiring often needs replacing before new appliances and aircon go in.
Full renovations of 4-room HDB flats, BTO and resale together, typically cost S$35,000 to S$100,000 in our completed projects. The gap between a package and a fully designed home is mostly carpentry, ceilings, lighting and finishes.
HDB rules for renovating a 4-room resale flat
These come from HDB's renovation guidelines for building works and electrical works (checked 27 November 2026).
| Work | Permit? | What to know |
|---|---|---|
| Demolishing or altering a wall | Yes | Work can only start after HDB's approval, and reinforced concrete structures must be left intact |
| Removing a non-load bearing reinforced concrete element | Yes | A Professional Engineer for civil or structural works must supervise the demolition |
| Replacing floor tiles | Yes | New finishes and screed together must not exceed 50mm |
| Replacing bathroom floor tiles | Yes | Pre-packed waterproofing screed and a membrane turned up at least 150mm against walls and kerbs |
| Overlaying floor finishes with adhesive | No | Only over a single existing layer, up to 13mm including adhesive |
| Laying vinyl | No | A quick way to refresh bedrooms |
| Overlaying wall tiles with adhesive | No | Up to 13mm, and a third layer is not allowed |
| Erecting a 63mm hollow block wall | No | Rooms created for living in still need natural light and ventilation |
Check the electrical supply as well. HDB says blocks completed on or after 1 January 1994, or upgraded under the Main Upgrading Programme or Home Improvement Programme, have a 40-amp main switch. Here is how to check your block's electrical supply and what to know about window replacement.
Design ideas for a 4-room resale flat

The photos here are from our Woodlands Drive project, a 4-room HDB flat completed in 2 months. It was designed for its owners, so its scope goes beyond the package. A few ideas that suit a 4-room layout:
- Pick one floor for the living areas. A single tile or vinyl tone from the door to the kitchen makes the flat feel longer.
- Mix two cabinet tones in the kitchen. Darker base cabinets hide wear, and a wood tone above keeps the room warm.
- Turn the third bedroom into a study. A built-in desk and shelves work harder than a spare bed.
- Use a feature wall behind the bed. Panelling or wallpaper there costs less than a full-room treatment.
- Plan sockets with the carpentry. Rewiring is the time to place points at the desk, bedside and TV console.
How long does it take?
Most resale HDB renovations take 10 to 16 weeks. Our 4-room HDB projects have taken 2 to 5 months, about 3 months on average. Hacking, rewiring and custom carpentry add time. Our guide to renovation timelines in Singapore explains each stage.
Checklist for comparing package quotes
- Hacking list. Which floors and walls are removed, and whether disposal is included.
- Tile allowance. The price per square foot and where it applies.
- Waterproofing. Which areas are treated and how they are tested.
- Piping. Whether the water pipes are replaced and in what material.
- Kitchen length. The foot run of cabinets and countertop, and the rate for extra.
- Electrical. Whether any points or rewiring are included.
- Permits. Who applies, and whether the contractor is HDB-licensed.
- Warranty. How long workmanship and carpentry are covered.
Ways to keep the cost down
- Lay vinyl over sound bedroom floors.
- Redo one bathroom fully and overlay the other if its tiles are sound.
- Keep the kitchen sink and hob where they are.
- Keep windows and doors that are in good condition and repaint them.
- Add non-essential carpentry after you move in.
Frequently asked questions
How much does it cost to renovate a 4-room resale HDB flat?
Our 4-room resale package costs about S$33,888 to S$35,888, covering demolition, tiling, plumbing, the kitchen and painting. With wardrobes, a shoe cabinet and a TV console, a typical budget comes to about S$42,200 to S$45,100.
Can I renovate only the kitchen and bathrooms?
Yes. Our kitchen and two bathrooms package costs about S$25,000 to S$27,500 for an HDB flat, and suits a flat whose floors are still in good condition.
Do I need a permit to hack tiles in a resale flat?
Replacing floor tiles needs an HDB permit, which your HDB-licensed contractor applies for. Laying vinyl, or overlaying a single layer of existing tiles with adhesive within 13mm, does not.
Get a quote for your 4-room resale flat
Every older flat is different, so a site visit gives you a firmer number than a package list. See our HDB renovation work, or request a free quote with your flat type and floor plan.