Landed renovations range from an interior makeover to a full rebuild, so the first question is what kind of work your home needs. In 2026 an interior renovation of a terrace house in Singapore typically costs S$150,000 to S$220,000, while additions and alterations (A&A) and rebuilds cost considerably more.
This guide explains the three types of landed renovation, typical costs and timelines for each, and the approvals involved.
Terrace interior (typical)
S$150k – S$220k
Terrace A&A (typical)
S$350k – S$500k
Terrace rebuild (typical)
S$900k – S$1.2M
Typical timeline
4 – 18 months
On this page
Landed renovation cost by type of work
Ranges vary with land size, number of storeys and finishes.
| Type of work | Terrace | Semi-detached | Detached / bungalow |
|---|---|---|---|
| Interior renovation | S$150k – S$220k | S$200k – S$300k | S$300k – S$450k |
| Additions & alterations | S$350k – S$500k | S$450k – S$650k | S$600k – S$900k |
| Reconstruction | S$900k – S$1.2M | S$1.1M – S$1.5M | S$1.6M – S$2.5M |
Interior renovation: No structural changes: flooring, kitchens, bathrooms, carpentry, lighting and finishes.
Additions & alterations: Structural work within planning limits, such as an extension, an extra storey, new staircases or roof changes. Needs an architect and engineer.
Reconstruction: Demolishing and rebuilding the house. Needs full planning and building approvals.
Terrace house interior renovation breakdown
A typical breakdown for a full interior renovation of an intermediate terrace house:
| Scope of work | Typical cost (SGD) |
|---|---|
| Hacking and demolition | S$12k – S$18k |
| Flooring and tiling | S$20k – S$30k |
| Carpentry (all floors) | S$45k – S$65k |
| Kitchen (wet and dry) | S$25k – S$35k |
| Bathrooms (×3–4) | S$30k – S$45k |
| Electrical rewiring and lighting | S$12k – S$18k |
| Plumbing and sanitary | S$6k – S$10k |
| Painting (interior and exterior) | S$8k – S$12k |
* Ranges reflect typical 2026 Singapore market rates for renovation work, excluding loose furniture and appliances. Your quote depends on your home's condition, scope and finishes.
Want an exact figure for your home?
Get a free quoteWhat affects the cost
Type of work
Interior-only renovations need no planning approval. A&A and rebuilds need an architect, a structural engineer and approvals, which add professional fees and time.
Size and storeys
Landed homes have more floor area, more bathrooms and often a staircase and roof terrace to finish.
Condition of the structure
Older houses may need roof repairs, waterproofing, rewiring and new plumbing.
Finishes
Natural stone, timber and bespoke joinery are common in landed homes and raise the budget.
Approvals for landed renovations
- Interior renovations without structural changes generally do not need planning approval.
- A&A and reconstruction need plans prepared and submitted by a qualified person, typically an architect, with structural design by a professional engineer.
- Approvals add several months before construction starts, so plan your timeline around them.
Ways to save
- Decide early whether you need structural changes; staying with an interior renovation saves fees and months of approvals.
- Reuse sound structure, roof and windows where possible.
- Focus premium finishes on the living, dining and master bedroom areas.
Timeline: Interior renovations usually take 4 to 6 months, A&A works 8 to 12 months, and reconstruction 12 to 18 months, plus time for approvals. See our renovation timeline guide.
Our landed projects
3-storey landedLorong Melayu
3-month renovation
Frequently asked questions
An interior renovation of a terrace house typically costs S$150,000 to S$220,000 in 2026. A&A works cost around S$350,000 to S$500,000, and a full rebuild S$900,000 to S$1,200,000.
A&A works alter or extend the existing house within planning limits. Reconstruction demolishes the house and builds a new one. Both need professional plans and approvals.
Not for interior-only renovations. For A&A or reconstruction you need a qualified person, usually an architect, plus a structural engineer.
About 4 to 6 months for an interior renovation, 8 to 12 months for A&A and 12 to 18 months for a rebuild, excluding approval time.
Related cost guides
- Condo Renovation Cost Singapore (2026)
- Kitchen Renovation Cost Singapore (2026)
- Carpentry Cost Singapore (2026): Price Per Foot Run
Design ideas: Kitchen island design ideas · Luxury master bedroom ideas


